DCS is a major green infrastructure in Hong Kong. The construction and operation of Government-led District Cooling System (DCS) in Kai Tak has demonstrated the viability of developing DCS in Hong Kong. The future large scale new developments in Northern Metropolis such as industrial and technology parks, university town, data centre, etc. are suitable to adopt their highly energy efficient DCS to contribute for laying out green transformation roadmap and achieving carbon neutrality before 2050.
As announced in 2025 Policy Address, the Government will strive to roll out an enhancement scheme within 2026 to encourage and facilitate the commissioning of small-scale district cooling systems or centralized multi-building cooling systems by non-governmental entities, from the aspects of technology, taxation, floor area arrangements, etc., with a view to enhancing the popularity of the relevant technologies and promoting the development of green technology.
District Cooling System has also been included in the Phase 2A of Hong Kong Taxonomy for Sustainable Finance issued by HKMA in January 2026 to facilitate market partitioners with green financing to promote green and sustainable transition to a low-carbon economy.
Lee Gardens in Causeway Bay is noteworthy as Hong Kong's first commercial distributed DCS. The developer proactively adopted DCS to leverage economies of scale for optimizing peak electricity demand and reduce operational and maintenance costs. The implementation of the system involved installation of chilled water pipes through elevated pedestrian walkways and vehicle tunnels, as well as the extensive use of "Multi-trade integrated Mechanical, Electrical & Plumbing (MiMEP)" construction techniques, resulting in significantly reduced construction costs.
The phased expansion of DCS in the Hong Kong Science Park and the installation of water pipe networks through utility tunnels. This innovative approach allows for flexible catering to the various building types, including laboratories, offices, exhibition halls, and retail stores.
To meet the new cooling demand, HKUST remodelled the central chiller plant to a DCS for supplying chilled water to the new building. This project achieved a substantial saving in construction costs and electricity consumption, and won the 2016 Association of Energy Engineers (AEE) Energy Project of the Year Award for Asia Pacific Region.