The Fresh Water Cooling Towers Scheme (2023 Edition) brochure (incorporating Addendum No.1/2026) has been published on 30 June 2026 and will be fully implemented on 30 Dec 2026. The new requirement of submission of Water Supply Impact Assessment (WSIA) is introduced.
(It came into effect from 30 December 2026 to replace 2023 Edition.)
*** Summary of major changes from the 2023 Edition [PDF format (307KB)]
(It came into effect from 21 May 2024 to replace 2016 Edition.)
*** Summary of major changes from the 2016 Edition [PDF format (172KB)]
(For application submitting on or after 21 May 2024, please refer to 2023 Edition.)
(For application submitting on or after 21 May 2024, please refer to 2023 Edition.)
*** Summary of major changes from the 2016 Edition [PDF format (172KB)]
(For application submitting on or after 21 May 2024, please refer to 2023 Edition.)
(For application submitting on or after 21 May 2024, please refer to 2023 Edition.)
[Notes: The diagrams are for general reference only. The designers should modify the diagram as appropriate to suit their projects.]
(Published by the Prevention of Legionnaires’ Disease Committee, Hong Kong)
*** Summary of major changes from the 2016 Edition [PDF format (172KB)]
* Note: Due to other reserved uses of water supply in the existing water supply system, the preliminary assessment of the Application for Participation (Form EMSD EE CT1A) in the respective Designated Area(s) will also be assessed by WSD on the adequacy of fresh water supply.